My Account: Log In | Join | Renew
Search
Author
Title
Vol.
Issue
Year
1st Page

Abstract

 

This article in SSSAJ

  1. Vol. 19 No. 4, p. 404-406
     
    Received: Oct 21, 1954
    Published: Oct, 1955


 View
 Download
 Alerts
 Permissions
 Share

doi:10.2136/sssaj1955.03615995001900040003x

A Tube Containing Gypsum Blocks for Following Moisture Changes in Undisturbed Soil1

  1. Ahmed G. Abd-El-Samie and
  2. Albert W. Marsh2

Abstract

Abstract

The increased use of gypsum blocks for following soil moisture changes and scheduling irrigations has stimulated efforts to improve their installation, performance, and removal from the field. Gypsum blocks were cast in tubes at 6-inch intervals to simulate the usual practice of installing a series of blocks through the root zone. Three types of block-in-tube constructions were described and results from their use reported. The results indicate that blocks perform satisfactorily when cast in tubes.

The tubes can be quickly installed in an auger or king tube hole, assuring intimate contact with undisturbed soil and roots. The problems associated with back-fill are eliminated and removal at the close of the season is easy. The length of time following installation for equilibrium with the surrounding soil to be reached is reduced.

  Please view the pdf by using the Full Text (PDF) link under 'View' to the left.

Copyright © . Soil Science Society of America